Skip to content

Schedule content preparation: news, posts, and articles in Kotia

Set up a schedule to run your Kotia workflow at chosen hours or weekdays. Covers run rules, time zone, saving and sending, and a morning news example.

Updated

Set up regular content preparation: Kotia will run your workflow at the chosen hours and days. For example, you can search industry news on weekday mornings, write posts based on it, and save them for review. If the workflow includes publishing, the result can go to a connected platform.

The schedule runs the entire chain of steps, so its tasks, sources, and recipients need to be prepared in advance. The schedule only sets when work starts. When the material appears depends on how long the steps take. Below, you'll find how to set up a morning run, how the time zone works, and how to check missed attempts.

Example: fresh news on weekday mornings

Suppose you run an industry blog and want to get texts based on relevant news every morning. Set up "News search": the topic, the geography, and the selection criteria. Pass the found materials to a card that prepares a post, and send the result to a folder in the Workspace.

For this workflow, you can set a run on weekdays at 09:00. If the search finds relevant news and the next steps complete successfully, a new piece of material will appear in the chosen folder. If you need to send it to a website or a channel, add the appropriate card and set up the recipient. First, check that a manual run produces a suitable result.

How to set up a weekday schedule

  1. Open the workflow you need. Check the source data, the tasks, and where the results are saved. If there is publishing, check the platform and the card's operating mode.
  2. Run the workflow manually and review the material. Fix any errors before you turn on regular runs.
  3. Click "Schedule" in the tools column, then click the gear icon for "Set up the rule."
  4. Add a condition. In the "How often" field, select "On chosen weekdays."
  5. Select Monday, Tuesday, Wednesday, Thursday, and Friday. In the "Hour" and "Minutes" lists, set 09:00.
  6. Check the time zone. Click the save icon in the rule window, then close the window.
  7. Turn on the schedule with the "Enabled" toggle. In the panel, check the "Next run" line. It shows the next date and time in the schedule's time zone.

An active subscription is required to turn on the schedule. The subscription gives access to the schedule. Paid workflow steps use tokens the same way manual runs do.

Schedule options

Condition Example of use
"Every few hours" Search for new material periodically throughout the day
"Every few days" Prepare a selection every few days at the chosen time
"On chosen weekdays" Write posts on weekdays, or a weekly review on a set day
"Once a month" Start preparing a monthly piece on the chosen date

You can combine several conditions in one rule. For example, to run the workflow on weekdays at 09:00 and on weekends at 11:00, add a second condition, select Saturday and Sunday, and set a different time.

The schedule allows runs no more than once an hour. Minutes in the window are selected in steps of 5 minutes. If several conditions match the same time, the same workflow doesn't run twice at the same moment.

You can remove an extra condition with the cross in its row in the panel. The last condition can't be removed this way. To cancel future automatic runs, turn off the schedule. The saved rule will remain.

How the time zone works

A new schedule uses the browser's time zone. After you save it, the schedule keeps running on that time zone, even if you open Kotia from another location.

If the schedule's time zone and the browser's time zone don't match, the interface shows the browser's time zone and suggests switching the schedule. If the schedule should run on the project's time, keep the previous time zone when you travel. Switch it when you want runs moved to local time. After making a change, check the next run in the panel.

How to prepare a workflow for regular runs

A schedule repeats the actions of the cards with their current settings. To make sure each run produces the material you need, check three things:

  • Where the new task comes from. For news, check the search and selection settings. For a topic queue, check that there are unassigned rows. Fixed text in "Data" won't change by itself by tomorrow.
  • Where the result goes. "Folder" creates a new document with each trigger. "Document" may append materials to a single file or replace its contents, depending on the selected mode.
  • Whether your response is needed. "Ask me" pauses the workflow until you make a decision. This suits review before sending, but without your involvement, the chain won't fully complete.

If you need publishing to WordPress, take the card's settings into account. Creating a draft doesn't mean publishing on the site. The schedule time also doesn't set a separate publication time for text that's already been prepared.

Where to see the result and the reason for a skipped run

Open "Runs". It shows completed attempts and schedule triggers that didn't start. From the step statuses, you can tell whether the materials were collected, whether the text is ready, and whether saving or sending finished.

If the previous run is still in progress, a second run doesn't start at the same time. Waiting for a response to "Ask me" also counts as work in progress.

To avoid checking the history manually, link Telegram in your profile. The Kotia bot sends a message about each completed scheduled run, each error, and each trigger that couldn't start (Telegram notifications). You can turn off unwanted messages in the same place.

Missed triggers aren't queued to run later. In the history, you can open the reason a run didn't start. This helps you tell a busy workflow apart from an error in the settings or in a step.

Why the schedule turned off

After 3 failed runs in a row, the schedule turns off. The cause may be an unready workflow, an execution error, or a lack of tokens. A successful scheduled run resets the count of failures. A skipped run because the workflow was already running doesn't count as one of these errors.

The schedule also turns off when your subscription ends. Work that has already started keeps running.

Before you turn the schedule back on, read the reason in the panel, fix the settings or top up your balance if needed, and check a manual run. The Readiness check can help you work through the notes on your cards. Simply turning off the schedule stops future triggers. To stop work that's already running, use the stop button in the workflow itself.